Industrial electricity price: what the 50 per cent condition means for operators

The 50 per cent condition on the industrial electricity price is usually quoted in short. The exact wording matters to furnace operators: the lining can be an eligible efficiency measure.

Finished monolithic refractory lining with cleanly executed connections at the shaft transition

The 50 per cent condition attached to the industrial electricity price is usually quoted in abbreviated form. Anyone who reads the exact wording will find the furnace in it.

What the rule requires

The German industrial electricity price has applied since January 2026: around 5 cents per kilowatt hour for up to half of consumption, limited until 2028. A condition is attached to it — at least 50 per cent of the subsidy amount has to be reinvested in decarbonisation measures, implemented in Germany, within 48 months. Among the measures recognised are energy efficiency measures affecting electricity demand as well as the use of industrial waste heat.

What this means for the furnace lining

  • Electrically heated furnaces: here a better lining directly reduces electricity demand. Old fireclay runs at a shell temperature of 80–120 °C, a layered fibre construction at 45–60 °C — depending on the initial condition, 10 to 20 per cent less energy input.
  • Gas-fired furnaces: the same measure reduces gas consumption. Commercially sensible, but not automatically eligible under this directive.
  • Planned conversions: anyone examining electrification should plan the heating system and the lining together. Considered separately, it costs two shutdowns.
  • Waste heat: the shell temperature is the most easily measurable source of loss — thermography before and after the measure, documented rather than estimated.

The classification under funding law is made by energy consultants and the BAFA (the German Federal Office for Economic Affairs and Export Control). We take care of the technical part and the documentation.

At a glance
~5 ct/kWh
for up to 50 % of consumption, limited until 2028
48 months
deadline for reinvestment in decarbonisation
10–20 %
less energy input thanks to a better lining

Practice sheets on this topic

Technical newsletter

Get new practice sheets automatically

All PDFs on this page are free, without sign-up. If you want to know when a new sheet is added: one e-mail a month, unsubscribe anytime.

The 50 per cent requirement: The furnace in reinvestment planning
PDFEnergy & Cross-Sector

The 50 per cent requirement: The furnace in reinvestment planning

Half of the relief must be reinvested — the furnace belongs on the list.

Only in the PDFElectric vs. gas-fired, orders of magnitude, documentation of evidence
To the article
Repair or reline? The three findings
PDFAll furnace types

Repair or reline? The three findings

When a targeted repair is enough, and the three findings where only a relining will hold.

Only in the PDFDecision table with 6 findings, the 3 typical wrong decisions, 2 photos from a relining
To the article
Refractory on the tube wall: The inspection points
PDFEnergy & Combustion

Refractory on the tube wall: The inspection points

Protecting without blocking the heat: what matters when lining a boiler tube wall.

Only in the PDF7-point checklist for tube walls, the 3 typical mistakes, 2 photos from the boiler
To the article

More insights from our projects

New insights from the job site every week – damage patterns, relinings and practical refractory know-how.

Share this article on LinkedIn

Planning a project?

Whether complete relining, repair or emergency — free initial consultation and a fast response.

CallSend enquiry

Your privacy matters to us.

We use cookies and similar technologies to ensure that our website functions properly and to analyse how our content is used. In the settings you can choose which cookies you wish to allow. Privacy policy