SBS Refractory Service
Lining and materials2 min

A dosing furnace is not a melting furnace: refractory lining in holding operation

A holding and dosing furnace does not melt, it keeps aluminium liquid for weeks. Instead of thermal shock, permanent contact with the melt dominates.

Freshly lined bath of a WESTOMAT dosing furnace with dosing chamber

A dosing furnace is not a small melting furnace — and must not be treated as one in refractory terms either. The reason lies in the loading: a holding and dosing furnace does not melt, it keeps aluminium liquid at around 700–750 °C for weeks on end. Instead of thermal shock from charging, permanent contact with the melt dominates — with infiltration, corundum growth and targeted attack at the level of the bath line.

What matters when lining a dosing furnace

  • Non-wetting, corundum-resistant materials: the melt should not take to the lining — that determines cleaning intervals and service life.
  • A monolithic, dense surface instead of many joints — every joint is an entry point for metal.
  • Dimensional accuracy: dosing accuracy depends directly on the geometry of the bath, riser tube and dosing chamber. Millimetres count here.
  • Controlled first heat-up with holding stages so that bound water escapes safely before the furnace goes into production.

The WESTOMAT dosing furnace project shown here stands for exactly this way of working: a tightly lined bath, clean transitions, stable dosing.

At a glance
700–750 °C
continuous temperature in holding operation
Millimetres
dimensional tolerance for dosing accuracy

Practice sheets on this topic

Technical newsletter

Get new practice sheets automatically

All PDFs on this page are free, without sign-up. If you want to know when a new sheet is added: one e-mail a month, unsubscribe anytime.

Repair or reline? The three findings
PDFAll furnace types

Repair or reline? The three findings

When a targeted repair is enough, and the three findings where only a relining will hold.

Only in the PDFDecision table with 6 findings, the 3 typical wrong decisions, 2 photos from a relining
To the article
Refractory on the tube wall: The inspection points
PDFEnergy & Combustion

Refractory on the tube wall: The inspection points

Protecting without blocking the heat: what matters when lining a boiler tube wall.

Only in the PDF7-point checklist for tube walls, the 3 typical mistakes, 2 photos from the boiler
To the article
Working in confined spaces: Before we go in
PDFAll plants

Working in confined spaces: Before we go in

Access, supervision, light and air: what is settled before anyone enters a furnace or boiler.

Only in the PDF7-point pre-entry checklist, the 3 typical omissions, 2 photos
To the article

More insights from our projects

New insights from the job site every week – damage patterns, relinings and practical refractory know-how.

Share this article on LinkedIn

Planning a project?

Whether complete relining, repair or emergency — free initial consultation and a fast response.

CallSend enquiry

Your privacy matters to us.

We use cookies and similar technologies to ensure that our website functions properly and to analyse how our content is used. In the settings you can choose which cookies you wish to allow. Privacy policy