Project overview

Initial situation

A divider wall separates flow paths inside the combustion chamber and is an unusual component: very long, very narrow and thermally loaded on both sides. The refractory lining has to stay dimensionally accurate over its entire length, because any deviation changes the flow pattern – and with it the burnout directly.

Scope of services

  • Measurement and formwork construction matched to the component geometry
  • Monolithic lining of both faces
  • Controlled compaction over the entire length
  • Stripping and checking of dimensional accuracy
  • Handover for heat-up

Project data

ComponentDivider wall in the combustion chamber
LocationNuremberg area
ServiceMonolithic refractory lining with formwork construction
IndustryEnergy supply / waste recovery
Challenges

The task

The geometry is narrow and elongated, so tolerances take effect over the entire length

The component is thermally loaded on both sides, so the lining must be equivalent on both faces

The work took place in the scaffolded combustion chamber, sealed off against dust

Formwork and compaction had to succeed evenly over the full length – rework in this position is laborious

Our solution

The SBS approach

We built the formwork to fit the geometry of the divider wall exactly, rather than working with standard elements. This keeps the wall thickness constant over the entire length.

The lining was executed monolithically. On such a narrow component every joint is a potential weak point – a continuous cast avoids them from the outset.

Compaction and curing were checked section by section so that no voids could remain in the narrow cross-section.

Project impressions

Precision work on a divider wall in pictures

Finished divider wall lining in the scaffolded combustion chamber
01

Monolithic lining over the full length – constant wall thickness with no joints

Results

Measurable results

The key figures of the “Precision work on a divider wall” project

Dimensionally true
Constant wall thickness over the entire component length
Joint-free
Monolithic execution with no weak points in the cross-section
Both faces
Equivalent lining on both thermally loaded sides
Made to fit
Formwork built to the component geometry