Combustion chamber refurbishment in a biomass power plant
Combustion chamber fundamentally overhauled – reduced energy costs, optimised plant performance

Initial situation
As part of planned maintenance measures, the operator of a biomass power plant commissioned SBS Refractory Service with the fundamental refurbishment of the combustion chamber. After an extended period in service the side brick lining was showing clear signs of wear, expansion joints were damaged and deposits were impairing the thermal efficiency of the plant.
Scope of services
- Damage analysis and refurbishment planning
- Complete renewal of the side brickwork
- Professional re-execution of the expansion joints with fibre blankets
- Thorough cleaning of the combustion chamber
- Acceptance and documentation
Project data
The task
The side brickwork was worn over a large area and had to be completely renewed
Damaged expansion joints called for professional re-execution using high-quality fibre blankets
Stubborn deposits in the combustion chamber were impairing heat transfer and had to be thoroughly removed
The work had to be completed within a planned shutdown period
The SBS approach
Our team first carried out a systematic damage analysis and drew up an agreed refurbishment concept. The side brickwork was completely dismantled and rebuilt using durable refractory materials.
The expansion joints were packed with high-quality fibre blankets and professionally reset – matched to the thermal expansion characteristics of the combustion chamber. The entire combustion chamber was also thoroughly cleaned.
The combination of renewed brickwork, optimised expansion joints and cleaned surfaces significantly improved the thermal efficiency of the plant and sustainably lowered energy costs.
Combustion chamber refurbishment in a biomass power plant in pictures

Renewed side brickwork in the combustion chamber – ready for continuous operation

Professionally executed expansion joints with high-quality fibre blankets
Measurable results
The key figures of the “Combustion chamber refurbishment in a biomass power plant” project
Similar references
Planning a project?
Whether complete relining, repair or emergency — free initial consultation and a fast response.