Checklist
Annual fire protection inspection in a battery energy storage system — 10 inspection points for existing plant
This checklist guides you through the annual inspection of the passive fire protection measures in an existing battery energy storage system. Ten inspection points show what to check on barriers, penetration seals and documentation, and how to record findings so they can be traced.
6 min.Last updated: 2026-08-24
Checklist
AB
Anton Brem
Managing Director
Refractory construction, high-temperature insulation and fire protection in industrial plants
Sources & standards
- DGUV Information 205-040 — Inspection intervals in fire protection
- DIN EN 1366-3 — Fire resistance tests for service installations, Part 3: Penetration seals
- DIBt — National technical approval (abZ) / General construction type approval (aBG)
- VdS 3103 — Lithium batteries (VdS Schadenverhütung)
- NFPA 855 — Standard for the Installation of Stationary Energy Storage Systems
Read on
Related guides
Planning a project?
Whether complete relining, repair or emergency — free initial consultation and a fast response.