SBS Refractory Service

Melting chamber overhaul in Austria

Melting chamber in Austria overhauled with targeted measures

Location:Austria
Plant type:Melting chamber
Repair areas:Side walls and floor
Method:Partial repair, pour-on process
Project overview

Initial situation

A customer in Austria commissioned SBS Refractory Service with the overhaul of a melting chamber on an aluminium furnace. The side walls showed local damage and the floor had lost level through continuous operation. To maintain production capability, a prompt and coordinated repair was required.

Scope of services

  • On-site condition assessment of the damaged areas
  • Partial repair of the side walls to restore the chamber structure
  • Pour-on process on the floor to restore the target level
  • Quality control and function test
  • Documentation and handover to the operator

Project data

LocationAustria
Plant typeMelting chamber
Repair areasSide walls and floor
MethodPartial repair, pour-on process
Challenges

The task

Several damaged areas – side walls and floor – each required specific repair methods

The partial repair of the side walls had to be executed in a way that preserved the structure and stability of the entire chamber

A pour-on process was needed on the floor to restore the original level precisely

As an international assignment, the project required the coordination of material and personnel across national borders

Our solution

The SBS approach

The overhaul was carried out in coordinated steps. First, the damaged areas of the side walls were repaired in a targeted manner. The partial repair allowed us to restore the structure and stability of the chamber efficiently, without completely replacing the walls.

The floor of the melting chamber was brought back to the required level using a precise pour-on process. This method ensures even heat distribution and protects the brick lining against further erosion.

Once all measures were complete, the plant could be returned to service quickly and reliably. The customer confirmed the high quality of the work and the professional cooperation.

Project impressions

Melting chamber overhaul in Austria in pictures

Melting chamber after the overhaul of the side walls and burner wall
01

Fully overhauled melting chamber – side walls and burner wall repaired

Second furnace during the overhaul work in Austria
02

Parallel work on the second furnace unit on site

SBS team carrying out repair work on an aluminium furnace in Austria
03

International assignment: our team at work in Austria

Results

Measurable results

The key figures of the “Melting chamber overhaul in Austria” project

2 areas
Side walls and floor overhauled
Restored
Structure and stability of the melting chamber
Precise
Floor level corrected using the pour-on process
International
Assignment in Austria successfully completed

Planning a project?