SBS Refractory Service

Complete overhaul of an aluminium furnace

30 % more capacity, 23 % lower energy consumption – through systematic modernisation

Furnace type:Aluminium furnace
Service:Complete overhaul and modernisation
Cause:Leaking door frame with consequential system damage
Industry:Aluminium industry
Project overview

Initial situation

A leaking door frame on an aluminium furnace had initially been classified as purely local damage. Closer analysis by SBS Refractory Service, however, revealed a systemic deterioration: oxygen ingress through the leak was causing increased slag formation, reduced melting capacity and a 30–40 % drop in aluminium yield per melting cycle.

Scope of services

  • Systematic damage analysis extending beyond the local defect
  • Overhaul of the door frame with new seals
  • Renewal of the refractory lining in critical areas
  • Revision of the thermal insulation and control systems
  • Controlled heat-up and performance documentation

Project data

Furnace typeAluminium furnace
ServiceComplete overhaul and modernisation
CauseLeaking door frame with consequential system damage
IndustryAluminium industry
Challenges

The task

The leak at the door frame had led to uncontrolled oxygen ingress

Increased slag formation considerably reduced the usable furnace capacity

Aluminium yield had fallen by 30–40 % per melting cycle

Repairing the frame alone would not have solved the systemic problems – an overall modernisation was required

Our solution

The SBS approach

Instead of simply repairing the door frame, our team carried out a comprehensive system modernisation. In addition to the professional overhaul of the frame, the door seals, control systems and the entire thermal insulation were revised.

The refractory lining was renewed in the critical areas and executed with materials offering improved resistance to slag attack. The furnace geometry was optimised to achieve a more even heat distribution.

After the modernisation was complete, the furnace was heated up under controlled conditions and the operating parameters were documented. The results clearly exceeded the customer's expectations.

Project impressions

Complete overhaul of an aluminium furnace in pictures

Modernised aluminium furnace after the complete overhaul
01

Fully modernised aluminium furnace – 30 % more capacity

Close-up of the renewed lining and seals
02

Renewed lining and optimised sealing systems

Results

Measurable results

The key figures of the “Complete overhaul of an aluminium furnace” project

+30 %
Increase in capacity per melting cycle
–23 %
Energy consumption per tonne of aluminium
Improved
Melt quality with fewer impurities
Reduced
Operational downtime thanks to sustainable modernisation