Project overview

Initial situation

A long-standing customer from the aluminium industry commissioned SBS Refractory Service with the complete core refurbishment of its aluminium melting furnace. After intensive continuous operation the existing refractory lining had reached the end of its service life. Increasing wear, slag build-up and declining thermal efficiency made a complete relining necessary in order to restore the furnace to full performance.

Scope of services

  • Detailed survey and lining planning
  • Complete demolition of the old lining with proper disposal
  • Inspection and repair of the steel shell
  • Layer-by-layer build-up of the new refractory lining
  • Controlled dry-out and heat-up in accordance with manufacturer specifications
  • Acceptance, documentation and handover to production

Project data

Furnace typeAluminium melting furnace
ServiceComplete core refurbishment and relining
MaterialHigh-quality refractory lining
IndustrySecondary aluminium
Challenges

The task

The old lining had to be removed completely and without residue, without damaging the steel shell

Tight deadlines called for precise planning and coordinated execution of all work steps

The new brick lining had to be matched exactly to the furnace geometry and the customer's specific operating conditions

The controlled heat-up after relining required strict adherence to the material-specific heat-up curve

Our solution

The SBS approach

Following a detailed survey, our engineering team developed an optimised lining concept. The old lining was demolished mechanically in strict compliance with all safety requirements. All residues were disposed of properly and the steel shell was checked for damage.

The new brick lining was built up layer by layer with high-quality refractory materials – matched to the thermal and chemical requirements of the aluminium melting process. Our experienced installation team worked with the utmost precision to ensure a homogeneous and durable lining.

Once the lining was complete, controlled dry-out and heat-up were carried out in accordance with the specified heat-up curve. The furnace was handed over to production on schedule and was able to resume regular melting operations immediately.

Project impressions

Complete relining of an aluminium melting furnace in pictures

Aluminium melting furnace after complete relining by SBS Refractory Service
01

Fully lined aluminium melting furnace – ready to return to service

Cleaned furnace interior before the relining
02

Thoroughly prepared furnace interior before the brick lining begins

Professional brick lining of the melting furnace with refractory materials
03

Precise brick lining with high-quality refractory materials

Results

Measurable results

The key figures of the “Complete relining of an aluminium melting furnace” project

On schedule
Handover to production within the planned time window
Optimised
Thermal efficiency thanks to a matched material concept
Durable
Significantly extended service life compared with the previous lining
Smooth
Seamless coordination from demolition to commissioning

Planning a project?

Whether complete relining, repair or emergency — free initial consultation and a fast response.