Charging chute lined monolithically – second assignment for a long-standing customer

When the customer no longer puts it out to tender the second time

Component:Charging chute
Service:Complete strip-out and monolithic relining
Special feature:Follow-up assignment for the same long-standing customer
Industry:Aluminium processing
Project overview

Initial situation

After the first partial repair in the firing structure, the same customer commissioned us again – this time for the charging chute. This area takes the charge material and is therefore loaded twice over: thermally from below and mechanically from above by every piece of material thrown in. The old lining was knocked out at the edges and cracked in the arch.

Scope of services

  • Strip-out of the knocked-out old lining
  • Formwork construction for chute and arch zone
  • Monolithic lining in a single operation
  • Controlled curing and stripping
  • Handover for heat-up during the running shutdown

Project data

ComponentCharging chute
ServiceComplete strip-out and monolithic relining
Special featureFollow-up assignment for the same long-standing customer
IndustryAluminium processing
Challenges

The task

The chute is narrow and has to be worked overhead – formwork and casting in confined conditions

The arch zone had to connect to the side walls without joints

Mechanical abrasion from the charge material calls for a resistant quality, not merely a heat-resistant one

The assignment had to fit into the same shutdown window as the remaining work

Our solution

The SBS approach

We stripped the chute completely and relined it monolithically. Particularly at edges under mechanical load, a continuous cast is superior to brickwork – there is no joint at which a brick can be loosened.

The arch zone was cast in the same operation, so that wall and roof form a single continuous shell.

Because the customer already knew us, coordination loops fell away: access, contacts and shutdown planning were settled from the start. The second assignment got going noticeably faster than the first.

Project impressions

Charging chute lined monolithically – second assignment for a long-standing customer in pictures

Monolithically lined charging chute with a view into the arch zone
01

Wall and arch merge without joints

Detail view of the newly lined chute wall
02

Evenly compacted surface after stripping

Newly lined chute from a second perspective
03

Continuous shell with no joints at the loaded edges

View from above into the finished charging chute
04

Handover condition before heat-up

Results

Measurable results

The key figures of the “Charging chute lined monolithically – second assignment for a long-standing customer” project

Joint-free
Wall and arch cast as a single continuous shell
Second order
Follow-up commission without renewed tendering
Edge-proof
Monolithic execution at the mechanically loaded edges
Within window
Completed during the running shutdown