SBS Refractory Service
Checklist

Fire protection in a new-build BESS: planning checklist from concept design to tender

This checklist sets out the fire protection decisions for a new battery energy storage system in twelve steps — from site selection and cell chemistry through to a tender-ready performance specification. You can see which document has to be available at which point.

6 min.Last updated: 2026-08-24

Checklist

Download checklist as PDF

Planning a project?

Whether complete relining, repair or emergency — free initial consultation and a fast response.