Checklist
Fire protection in a new-build BESS: planning checklist from concept design to tender
This checklist sets out the fire protection decisions for a new battery energy storage system in twelve steps — from site selection and cell chemistry through to a tender-ready performance specification. You can see which document has to be available at which point.
6 min.Last updated: 2026-08-24
Checklist
AB
Anton Brem
Managing Director
Refractory construction, high-temperature insulation and fire protection in industrial plants
Sources & standards
- NFPA 855 — Standard for the Installation of Stationary Energy Storage Systems
- UL Solutions — UL 9540A Test Method for Battery Energy Storage Systems
- VdS 3103 — Lithium batteries (VdS Schadenverhütung)
- IEC 62619:2022 — Safety requirements for secondary lithium cells and batteries for industrial applications
- DIBt — National technical approval (abZ) / General construction type approval (aBG)
Read on
Related guides
Planning a project?
Whether complete relining, repair or emergency — free initial consultation and a fast response.